Concept design

A form that carries your intent and survives reality.

See how the project would sit on the site. A concept an investor can judge and defend before the authority.

What we deliver

Deliverables, required inputs, and boundaries - one overview in the Scope tab below.

Full scope

What we need from you

  • Confirmed conclusion from the feasibility study.
  • Programme priorities: must-have, nice-to-have, negotiable.
  • Investment range as an order of magnitude.
  • Any deadlines or constraints affecting this service (tenders, seasonal building).
More in scope

Concept design translates feasibility into architecture. The aim is a clear spatial organisation, a defined mass, and a defined programme, before expensive detail documentation begins.

This is the first time the client sees space, not just numbers. The largest number of irreversible decisions are made here. That is why we prepare at least three spatial options with a balance of trade-offs.

The service is available for projects in Zagreb, Zadar, Dalmatia, and other locations in Croatia, depending on project type and scope.

ScopeFAQWhy TenetContact

Idejni projekt, kontekst.
2.3.1

What we deliver

Three views on the same scope: deliverables, your inputs, and what is out of scope.

  • 1Concept-level plans, sections, and elevations at agreed scale.
  • 2Three options with a written comparison of strengths and limitations.
  • 3Volumetric study (3D model, render, or physical model depending on package).
  • 4Programme diagram: uses, areas, relationships.
  • 5Written recommendation for continuation, with the scope for the location permit.
Idejni projekt, pregled usluge.
Idejni projekt, dokumentacija.

A question about what you just read? Write to us.

2.3.3

Duration and rhythm

Usually four to eight weeks, with two to three written decision points during this service.

Idejni projekt, trajanje.
2.3.4

Scope

  • Concept is not a permit submission. That is the location permit procedure.
  • Renders are a communication tool, not a contractual material specification.
  • Programme changes after the final decision are handled by written addendum.
Idejni projekt, opseg.
2.3.5

When we finish this service for you, what is your next step toward a completed project?Location permit (Submission)

When concept design closes, the location permit opens, or, exceptionally, direct entry into the main project when the regulatory frame is already known.

Idejni projekt, nastavak.
2.3.6

Frequently asked questions

Idejni projekt, regulatorni okvir.

Have a question? Send a short enquiry.

2.3.9 · Risks and solutions

Where concept design typically breaks and how we prevent it.

  • Risk

    Revisions after a verbal lock

    The concept is treated as finished verbally, then new requests follow. Each round changes volume, facade, or layout without a clear boundary.

    Solution

    Versioned reviews with sign-off

    We label each variant and send it for written approval. Only then does work move toward the location permit or main project.

  • Risk

    Conflict with the spatial plan

    Form and envelope develop before the plan is checked. A late conflict forces expensive rework of the concept.

    Solution

    Regulatory check inside the concept

    Plan review is part of the concept, not a late add-on. Parcel limits and use keep the form honest from the first drawing.

  • Risk

    Build cost above expectations

    The idea reads well on paper but build cost was not tested. The client sees the gap only on the contractor's quote.

    Solution

    Indicative estimate in the concept

    We give an investment range by major item already in the concept service. Figures are rough but enough to decide before the next service.

  • Risk

    Unclear use rights

    Renders and views are used in sales or marketing without an agreement on authorship. A later dispute costs more than an early contract.

    Solution

    Written frame before publication

    Use, transfer, and publication are agreed before work starts. Anything not in the offer stays out of circulation.

2.3.10 · Document checklist

What enables serious concept work.

  • 1Conclusion from plot analysis or equivalent plan extract.
  • 2Programmatic brief (unit count, areas, priorities).
  • 3Indicative budget and time frame.
  • 4Existing sketches, site photography, surveys if available.
  • 5Names of consultants already engaged (structure, MEP, landscape).

A missing document is not a blocker for the first conversation. Note what you have, what is missing, and what you would like to reconstruct.

Idejni projekt, veze.

2.3.12 · How this connects

Concept design in the decision chain.

Concept design is the first service that turns space into a document. Everything that later enters the permit and execution stages rests on the decisions made here.

Useful in parallel

·

Investor presentation

Used as the basis for conversations with investors and banks.

Concept design itself is not a permit act; production sits within the authority of a chartered architect.

Idejni projekt, standardi.
2.3.7

Industry standards we build on

Concept design is not a design presentation, it is an operational decision document. Concept quality directly drives the number of downstream revisions and coordination cost.

  • RIBA Stage 2 · Concept Design

    Test and lock the spatial strategy before technical commitment.

  • AIA Schematic Design

    Communicate intent with sufficient rigour for the approvals pathway.

  • ISO 19650

    Concept decisions documented as authoritative baseline for later packages.

  • Change-control

    Revision rounds, decision log, explicit exclusions.

Quick contact

Send a quick enquiry · Concept design

Email opens your mail app (Gmail, Outlook, Apple Mail) with a pre-filled message to info@tenet.hr. WhatsApp opens chat with the same message.

Direct contact

Write to us or call.

Reply within 48 business hours. TENET does not provide loan brokerage. We use your data only for the agreed engagement.