Izvedbeni projekt, pregled usluge.

Execution project

Execution project

Documentation for the contractor, not the desk.

What we deliver

Deliverables, required inputs, and boundaries - one overview in the Scope tab below.

Full scope

What we need from you

  • Final building permit (or documented agreement on parallel scope).
  • Confirmed materials and equipment at agreed checkpoints.
  • Named contractor or intent to select contractor (for detail level alignment).
  • Cooperation with site supervision and the health and safety coordinator.
More in scope

The execution project translates the main project into drawings, details, and specifications the contractor uses on site. The aim is to reduce improvisation and protect the client from on-site reinterpretation.

Execution design is not a duplicate main project, it is the operational layer. What is drawn here narrows the room for on-site negotiation; negotiation without a document is cost. This service opens when the path to construction is sufficiently clear.

ScopeFAQWhy TenetContact

Izvedbeni projekt, kontekst.
2.5.1

What we deliver

Three views on the same scope: deliverables, your inputs, and what is out of scope.

  • 1Execution architectural drawings (plans, sections, elevations, details).
  • 2Joint, material, and built-in element details at agreed scope.
  • 3Material and equipment specifications (or coordination with interior/joinery).
  • 4Bill of quantities with work descriptions and indicative quantities.
  • 5Revision register per drawing and contractor handover date.
Glavni projekt, pregled usluge.
Izvedbeni projekt, dokumentacija.

A question about what you just read? Write to us.

2.5.3

Duration and rhythm

Typically two to four months after work begins, depending on complexity and design changes during execution detailing.

Izvedbeni projekt, trajanje.
2.5.4

Scope

  • We do not perform construction or manage the site.
  • We do not assume liability for contractor deviations from the documentation.
  • We do not replace the main project; execution supplements, does not change the permit without addendum.
Izvedbeni projekt, opseg.
2.5.5

When we finish this service for you, what is your next step toward a completed project?Legalization

Handover of execution documentation to the contractor closes the design documentation for the standard new-build track. Legalization (07) activates only if as-built deviation or missing documentation of existing stock is identified.

Izvedbeni projekt, nastavak.
2.5.6

Frequently asked questions

Izvedbeni projekt, regulatorni okvir.

Have a question? Send a short enquiry.

2.5.9 · Risks and solutions

Typical site cost drivers.

  • Risk

    Late contractor confirmation

    Detail level depends on what the contractor actually builds, and the contractor joins late. Drawings stay too thin or get rewritten during construction.

    Solution

    Detail level in the first week

    At the start of the execution project we agree who builds and what detail level we expect. A detail plan goes into a written table by discipline.

  • Risk

    Material changes without paper

    On site a different tile, window, or fitting is agreed without an updated drawing. Later it is hard to prove what was agreed.

    Solution

    Written change protocol

    Every change goes through a short record: what changes, who approves, which drawing version applies. Without approval the work is not treated as agreed.

  • Risk

    Unclear responsibility split

    Designer, supervisor, and contractor give different instructions to workers on site. The client does not know who owns which decision.

    Solution

    Clear split in contract

    We write the split of work in contracts and repeat it in weekly updates. Site communication goes through agreed channels, not ad hoc.

  • Risk

    Late sample approval

    Tiles, colours, or equipment wait for client sign-off while contractor deadlines run. Construction stops or goes to storage and extra cost.

    Solution

    Checkpoints with deadlines

    The sample and decision plan has deadlines and a named person on the client side. Delays are logged and escalated in writing.

2.5.10 · Document checklist

What enables a calm execution project.

  • 1Final building permit or a documented parallel scope.
  • 2Named or planned contractor.
  • 3Material and equipment specifications at agreed checkpoints.
  • 4Supervision and safety-coordinator contracting plan.
  • 5Readiness for timely sample decisions.

A missing document is not a blocker for the first conversation. Note what you have, what is missing, and what you would like to reconstruct.

Izvedbeni projekt, veze.

2.5.12 · How this connects

Where execution design sits in the process.

Execution design is the bridge between permit and site. With it, execution is measured and controlled; clear documentation narrows the room for interpretation.

6

Execution project

This service

Unlocks next

·

Site execution

The contractor builds from execution drawings; documentation keeps decisions within the frame.

·

Site supervision

Supervision measures the situation against the execution documentation.

Useful in parallel

·

Small repetitive interventions

In some cases the main project alone is enough, but the risk of improvisation grows.

Execution design does not change the building permit; any change touching the permitted scope is handled as a written addendum.

Izvedbeni projekt, standardi.
2.5.7

Industry standards we build on

The execution project demands the strictest coordination of details, materials, and tolerances. What is resolved on paper avoids costly site decisions.

  • RIBA Stage 5

    Manufacturing/construction information, coordinated technical release.

  • AIA Construction Documents · CA

    Contractor detailing and support during execution.

  • ISO 19650 · IFC

    Issue for construction: controlled release and revisions.

  • Site change-control

    Field changes logged, assessed, approved.

Quick contact

Send a quick enquiry · Execution project

Email opens your mail app (Gmail, Outlook, Apple Mail) with a pre-filled message to info@tenet.hr. WhatsApp opens chat with the same message.

Direct contact

Write to us or call.

Reply within 48 business hours. TENET does not provide loan brokerage. We use your data only for the agreed engagement.