Main project

Main project (final design)

Full architectural and technical documentation for a building-permit application.

What we deliver

Deliverables, required inputs, and boundaries - one overview in the Scope tab below.

Full scope

What we need from you

  • Final location permit (or documented exception agreed with the authority).
  • Confirmed decision points from concept design (or addendum if programme changed).
  • Timely approval of samples and specifications at agreed checkpoints.
  • Designation of partner offices for disciplines (if not contracted via us).
More in scope

The main project translates architectural logic into the technical documentation required for a building-permit application. Architecture, structure, and building services are coordinated into one verifiable package.

This is not the authority procedure, it is the documentation that makes the matter legible for a building permit. The risk here is discipline misalignment: what architecture draws must hold with structure and services. Every cross-discipline decision goes into a written log.

The service is available for projects in Zagreb, Zadar, Dalmatia, and other locations in Croatia, depending on project type and scope.

ScopeFAQWhy TenetContact

Glavni projekt, kontekst.
2.4.1

What we deliver

Three views on the same scope: deliverables, your inputs, and what is out of scope.

  • 1Architectural main project with plans, sections, and elevations at prescribed level.
  • 2Coordination and integration of discipline packages (structure, MEP, fire, energy as required).
  • 3Technical description of the building and materials at main-project level.
  • 4Drawing and elaborates list with versions and dates.
  • 5Written cross-discipline decision log and open points for the building permit.
Glavni projekt, pregled usluge.
Glavni projekt, dokumentacija.

A question about what you just read? Write to us.

2.4.3

Duration and rhythm

Typically three to five months, depending on complexity, number of disciplines, and client decision speed. We express deadlines as ranges.

Glavni projekt, trajanje.
2.4.4

Scope

  • We do not run the building-permit procedure, that is a separate service.
  • We do not perform construction or site supervision (separate engagement).
  • We do not guarantee authority acceptance without supplements, supplements are part of the process.
Glavni projekt, opseg.
2.4.5

When we finish this service for you, what is your next step toward a completed project?Building permit (Submission)

On delivery of the main project we start the building permit procedure, or agreed parallel preparation of execution design for items independent of the permit.

Glavni projekt, nastavak.
2.4.6

Frequently asked questions

Glavni projekt, regulatorni okvir.

Have a question? Send a short enquiry.

2.4.9 · Risks and solutions

Where the main project typically stalls.

  • Risk

    Discipline misalignment

    Architecture, structure, and building services often run in parallel, each on its own schedule. When the package is assembled late, clashes surface only before filing or during a supplement cycle.

    Solution

    Coordinated package before filing

    We align drawings and descriptions from every discipline into one review set. Open points go into a cross-discipline decision log until they are closed.

  • Risk

    Changes after the concept is accepted

    The client asks for a different layout, material, or equipment once the main project is underway. Without a record, changes repeat and consume time and budget.

    Solution

    Written addendum for every decision

    We measure each change against its impact on drawings, elaborates, and timeline. We confirm it with an addendum and an updated decision record before work continues.

  • Risk

    Specification with no alternative

    A material or item is listed from a single manufacturer while the contractor contract is already signed. If the item fails, the site stops or improvises at the client's cost.

    Solution

    Alternatives in the specification

    We add substitute items to the specification where it makes sense. Savings and approved substitutions are recorded in writing, not verbally on site.

  • Risk

    Disciplines brought in too late

    Structure or services join only after architecture already has mature drawings. Late alignment forces rework and lengthens the main project.

    Solution

    Work plan in the first week

    We agree discipline sequence and checkpoints at the start of the service. Each office knows when it delivers input and when it receives feedback.

2.4.10 · Document checklist

What must be closed before the main project.

  • 1Final location permit or a documented exception.
  • 2Locked decision note from the concept design.
  • 3Named offices for disciplines (or readiness to contract via us).
  • 4Survey data refreshed if older than 12 months.
  • 5Readiness to approve samples and specifications on time.

A missing document is not a blocker for the first conversation. Note what you have, what is missing, and what you would like to reconstruct.

Glavni projekt, veze.

2.4.12 · How this connects

Where the main project sits in the process.

The main project is the documentation layer between concept and permit. With it, the building permit can start and every later site decision can be defended.

Useful in parallel

·

Contractor pricing

Often used as the basis for tighter contractor pricing before execution.

Documentation is signed by authorised authors; the authority reviews the package during the procedure, the studio does not.

Glavni projekt, standardi.
2.4.7

Industry standards we build on

The main project is documentation at the level required for the building permit. Coordination rigour between architecture, structure, and MEP directly drives the number of supplements during the procedure.

  • RIBA Stage 4

    Technical design as a coordinated release toward the permit.

  • AIA Construction Documents

    Discipline coordination and clarity for the building permit.

  • ISO 19650

    Issue for permit: controlled release with traceability.

  • FIDIC roles

    Clear designer, client, contractor responsibility split.

Quick contact

Send a quick enquiry · Main project

Email opens your mail app (Gmail, Outlook, Apple Mail) with a pre-filled message to info@tenet.hr. WhatsApp opens chat with the same message.

Direct contact

Write to us or call.

Reply within 48 business hours. TENET does not provide loan brokerage. We use your data only for the agreed engagement.