Main project

Main project

Architectural and technical documentation for a building-permit application.

What we deliver

Deliverables, required inputs, and boundaries - one overview in the Scope tab below.

Full scope

What we need from you

  • Complete package of special conditions and utility connection terms from the municipality, authorities, and utilities.
  • Location permit when required, or confirmed information on the applicable administrative framework.
  • Confirmed decision points from concept design (or addendum if programme changed).
  • Timely approval of samples and specifications at agreed checkpoints.
More in scope (+1)

Once the location frame is clear, you need technical documentation for the building permit. The main project helps you bring architecture, structure, and building services into one coordinated package. We develop the adopted design into drawings, calculations, technical descriptions, and discipline elaborates, with controlled revisions.

This is not the authority procedure. It is the documentation that shows the works clearly enough for a building permit. The risk here is discipline misalignment: what architecture draws must hold with structure and services. Every cross-discipline decision goes into a written log.

We work on projects across Croatia: Zagreb, Zadar, Dalmatia, Istria, Kvarner, the islands, and elsewhere.

ScopeFAQWhy TenetContact

Glavni projekt, kontekst.
2.4.1

What we deliver

Three views on the same scope: deliverables, your inputs, and what is out of scope.

  • 1Architectural main project with plans, sections, and elevations at prescribed level.
  • 2Coordination and integration of discipline packages (structure, MEP, fire, energy as required).
  • 3Technical description of the building and materials at main-project level.
  • 4Drawing and elaborates list with versions and dates.
  • 5Written cross-discipline decision log and open points for the building permit.
Glavni projekt, pregled usluge.
Glavni projekt, dokumentacija.

A question about what you just read? Write to us.

2.4.3

Duration and rhythm

Three months from receipt of the complete package of special conditions and utility connection terms.

Glavni projekt, trajanje.
2.4.4

Scope

  • We do not run the building-permit procedure; that is a separate service.
  • We do not perform construction or site supervision (separate contract).
  • We do not guarantee authority acceptance without supplements. If a supplement is requested, we act within the contracted service and each designer’s responsibility.
Glavni projekt, opseg.
2.4.5

When we finish this service for you, what is your next step toward a completed project?Building permit (Submission)

On delivery of the main project we can prepare and submit the building-permit application if that service is contracted. Where agreed, we also prepare execution design in parallel for items independent of the permit.

Glavni projekt, nastavak.
2.4.6

Frequently asked questions

Glavni projekt, regulatorni okvir.

Request an initial review. Send a short note.

2.4.9 · Risks and responses

Where the main project typically stalls.

  • Risk

    Discipline misalignment

    Architecture, structure, and building services often run in parallel, each on its own schedule. When the package is assembled late, clashes surface only before filing or during a supplement cycle.

    Solution

    Coordinated package before filing

    We align drawings and descriptions from every discipline into one review set. Open points go into a cross-discipline decision log until they are closed.

  • Risk

    Changes after the concept is accepted

    The client asks for a different layout, material, or equipment once the main project is underway. Without a record, changes repeat and consume time and budget.

    Solution

    Written addendum for every decision

    We measure each change against its impact on drawings, elaborates, and timeline. We confirm it with an addendum and an updated decision record before work continues.

  • Risk

    Specification with no alternative

    A material or item is listed from a single manufacturer while the contractor contract is already signed. If the item fails, the site stops or improvises at the client's cost.

    Solution

    Alternatives in the specification

    We add substitute items to the specification where it makes sense. Savings and approved substitutions are recorded in writing, not verbally on site.

  • Risk

    Disciplines brought in too late

    Structure or services join only after architecture already has mature drawings. Late alignment forces rework and lengthens the main project.

    Solution

    Work plan in the first week

    We agree discipline sequence and checkpoints at the start of the service. Each office knows when it delivers input and when it receives feedback.

2.4.10 · Document checklist

What must be closed before the main project.

  • 1Final location permit or a documented exception.
  • 2Locked decision note from the concept design.
  • 3Named offices for disciplines (or readiness to contract via us).
  • 4Survey data refreshed if older than 12 months.
  • 5Readiness to approve samples and specifications on time.

A missing document does not block the first conversation. Tell us what you have, what is missing, and what you want to reconstruct.

Glavni projekt, veze.

2.4.12 · How this connects

Where the main project sits among the stages

The main project is the documentation layer between concept and permit. With it, the building permit can start and later site decisions can be defended.

Useful in parallel

·

Contractor pricing

Often used as the basis for tighter contractor pricing before execution.

Documentation is signed by authorised authors. The authority reviews the package during the procedure.

Glavni projekt, standardi.
2.4.7

Standards we work to

The main project is documentation at the level required for the building permit. Coordination between architecture, structure, and MEP directly drives the number of supplements during the procedure.

  • RIBA Stage 4

    Technical design as a coordinated release toward the permit.

  • AIA Construction Documents

    Discipline coordination and clarity for the building permit.

  • ISO 19650

    Issue for permit: controlled release with traceability.

  • FIDIC roles

    Clear designer, client, contractor responsibility split.

Quick contact

Send a quick enquiry · Main project

Email opens your mail app (Gmail, Outlook, Apple Mail) with a pre-filled message to info@tenet.hr. WhatsApp opens chat with the same message.

Direct contact

Write to us or call.

We reply within 48 business hours. We use your data only for the agreed work.