Existing condition and access
An as-built survey is only possible with access to the property and a basic evidence base.

Filing is open again from 16 May 2026, with no application deadline, only for buildings existing by 21 June 2011.
Deliverables, required inputs, and boundaries - one overview in the Scope tab below.
Full scopeFiling is only through eDozvola; the competent body is the one where the building stands.
When an existing structure lacks a valid permit, the first question is whether it falls under the Act at all. From 16 May 2026, new requests for an as-built status decision are filed only through eDozvola, with the full Article 11 attachments. Before we quote, we check DOF evidence, Article 6 exclusions, and whether you already have a pending file.
Legalisation is work inside an inherited condition. We do not promise the decision. We coordinate the as-built survey, geodesy, stability statement, and filing so you know where you stand before you sign.

Three views on the same scope: deliverables, your inputs, and what is out of scope.


A question about what you just read? Write to us.
Preparation typically takes four to twelve weeks; total procedure length is set by the authority and can range from several months to over a year.


When the authority issues its decision and the documentation is complete, legalisation is closed. An as-built status decision does not mean all future location conditions for reconstruction were checked. By your choice, the file moves to archive or into a subsequent reconstruction cycle.


A decision on the as-built state does not automatically mean that all future location/technical conditions for new construction or reconstruction have been examined.
Request an initial review. Send a short note.
There are not enough photos, invoices, or other proof that the building existed at the reference moment. The procedure stops at the first check.
Before starting we walk the evidence list and mark gaps. Missing items are requested immediately, before filing on eDozvola.
The structure sits in a protected area, corridor, or heritage buffer. Category and procedure differ sharply from a standard legalisation.
Before contracting we check protection layers and applicable rules on the parcel. The client gets a clear answer on whether the procedure can start.
A request without all Article 11 attachments is not considered filed. The body returns the case and time is lost reassembling it.
We assemble the full file and check attachments against Article 11 before filing on eDozvola.
Co-owners disagree on who files or who pays. The procedure cannot proceed calmly without clear authority.
Ownership and business open points are resolved before legalisation starts. Without that we do not enter elaborates.
A missing document does not block the first conversation. Tell us what you have, what is missing, and what you want to reconstruct.

Legalisation is a standalone track. It does not continue into new design services. It puts the status of an existing situation in order before any new decision.
An as-built survey is only possible with access to the property and a basic evidence base.
Open ownership disputes block the procedure before it starts.
Legalisation
A settled status opens the frame for a transaction or lending.
Legalised status gives a clear frame for further work on the existing building.
Often enters as the first step in risk assessment of an existing property.
The regularisation procedure runs under the applicable Act on the Treatment of Illegally Built Buildings and implementing acts. The decision is not guaranteed.

Legalisation in practice is not one document. It is a chain of evidence. We separate early what we can prove from what we want to achieve.
Authoritative capture of built conditions before legal closure.
Legal status verification before transaction or financing.
Geodesy, architecture, structural statements where required.
Evidence map, versioned submissions, auditable procedural log.
Email opens your mail app (Gmail, Outlook, Apple Mail) with a pre-filled message to info@tenet.hr. WhatsApp opens chat with the same message.
Download the document list, or send an enquiry for a fixed quote for legalisation.
We reply within 48 business hours. We use your data only for the agreed work.