Skip to content
Legalizacija, pregled usluge.

Legalisation

Legalisation of an existing building

Filing is open again from 16 May 2026, with no application deadline, only for buildings existing by 21 June 2011.

What we deliver

Deliverables, required inputs, and boundaries - one overview in the Scope tab below.

Full scope

What we need from you

  • Ownership and possession extracts, access for survey.
  • Power of attorney for eDozvola filing and supplements.
  • Existing documentation and construction-date evidence if available.
  • Payment of the retention fee and administrative charges when assessed.
More in scope

Filing is only through eDozvola; the competent body is the one where the building stands.

When an existing structure lacks a valid permit, the first question is whether it falls under the Act at all. From 16 May 2026, new requests for an as-built status decision are filed only through eDozvola, with the full Article 11 attachments. Before we quote, we check DOF evidence, Article 6 exclusions, and whether you already have a pending file.

Legalisation is work inside an inherited condition. We do not promise the decision. We coordinate the as-built survey, geodesy, stability statement, and filing so you know where you stand before you sign.

ScopeFAQWhy TenetContact

Legalizacija, kontekst.
2.8.1

What we deliver

Three views on the same scope: deliverables, your inputs, and what is out of scope.

  • 1As-built survey (licensed architect) under Article 11(4).
  • 2Coordination of the geodetic as-built survey in GML (licensed survey engineer).
  • 3Coordination of the licensed civil engineer’s stability statement.
  • 4DGU visibility certificate in the file and eDozvola filing with a written correspondence log.
  • 5Written conclusion after the competent authority’s decision.
Lokacijska dozvola, pregled usluge.
Legalizacija, dokumentacija.

A question about what you just read? Write to us.

2.8.3

Duration and rhythm

Preparation typically takes four to twelve weeks; total procedure length is set by the authority and can range from several months to over a year.

Legalizacija, trajanje.
2.8.4

Scope

  • We do not guarantee an as-built status decision. The assessment shows what is available, where it narrows, and what comes next.
  • We do not certify DOF visibility in place of DGU. We do not handle demolition or negotiations with third parties.
  • We do not provide legal advice; cooperation with a lawyer is necessary in these cases.
Legalizacija, opseg.
2.8.5

When we finish this service for you, this project cycle is complete.

When the authority issues its decision and the documentation is complete, legalisation is closed. An as-built status decision does not mean all future location conditions for reconstruction were checked. By your choice, the file moves to archive or into a subsequent reconstruction cycle.

Legalizacija, nastavak.
2.8.6

Frequently asked questions

Legalizacija, regulatorni okvir.

Request an initial review. Send a short note.

2.8.9 · Risks and responses

Where legalisation breaks.

  • Risk

    Missing evidence of existence

    There are not enough photos, invoices, or other proof that the building existed at the reference moment. The procedure stops at the first check.

    Solution

    Early evidence-set review

    Before starting we walk the evidence list and mark gaps. Missing items are requested immediately, before filing on eDozvola.

  • Risk

    Building in a protected zone

    The structure sits in a protected area, corridor, or heritage buffer. Category and procedure differ sharply from a standard legalisation.

    Solution

    Site and zone pre-check

    Before contracting we check protection layers and applicable rules on the parcel. The client gets a clear answer on whether the procedure can start.

  • Risk

    Incomplete eDozvola file

    A request without all Article 11 attachments is not considered filed. The body returns the case and time is lost reassembling it.

    Solution

    Complete submission before filing

    We assemble the full file and check attachments against Article 11 before filing on eDozvola.

  • Risk

    Open ownership dispute

    Co-owners disagree on who files or who pays. The procedure cannot proceed calmly without clear authority.

    Solution

    Legal status before regularisation

    Ownership and business open points are resolved before legalisation starts. Without that we do not enter elaborates.

2.8.10 · Document checklist

What we need before legalisation.

  • 1Ownership extract and land-registry record.
  • 2Old drawings, surveys, dated photographs of the building.
  • 3Documents confirming the time of construction (invoices, permits, letters).
  • 4Details for the DGU DOF5/2011 visibility certificate request.
  • 5eDozvola access (e-Građani) or power of attorney for filing.
  • 6Power of attorney if the applicant is not the owner.

A missing document does not block the first conversation. Tell us what you have, what is missing, and what you want to reconstruct.

Legalizacija, veze.

2.8.12 · How this connects

Where legalisation sits among the stages

Legalisation is a standalone track. It does not continue into new design services. It puts the status of an existing situation in order before any new decision.

Before this service

·

Existing condition and access

An as-built survey is only possible with access to the property and a basic evidence base.

·

Clear ownership

Open ownership disputes block the procedure before it starts.

7

Legalisation

This service

Unlocks next

·

Sale or financing

A settled status opens the frame for a transaction or lending.

·

Reconstruction of an existing building

Legalised status gives a clear frame for further work on the existing building.

Useful in parallel

·

Check before investment

Often enters as the first step in risk assessment of an existing property.

The regularisation procedure runs under the applicable Act on the Treatment of Illegally Built Buildings and implementing acts. The decision is not guaranteed.

Legalizacija, standardi.
2.8.7

Standards we work to

Legalisation in practice is not one document. It is a chain of evidence. We separate early what we can prove from what we want to achieve.

  • As-built / record practice

    Authoritative capture of built conditions before legal closure.

  • Real-estate due diligence

    Legal status verification before transaction or financing.

  • Multi-disciplinary evidence

    Geodesy, architecture, structural statements where required.

  • Case-file governance

    Evidence map, versioned submissions, auditable procedural log.

Quick contact

Send a quick enquiry · Legalisation

Email opens your mail app (Gmail, Outlook, Apple Mail) with a pre-filled message to info@tenet.hr. WhatsApp opens chat with the same message.

Checklist or quote

Legalisation checklist

Download the document list, or send an enquiry for a fixed quote for legalisation.

Direct contact

Write to us or call.

We reply within 48 business hours. We use your data only for the agreed work.