Concept design
A concept aligned with the spatial plan gives the procedure its input document.

Deliverables, required inputs, and boundaries - one overview in the Scope tab below.
Full scopeFiled with the competent spatial planning and construction department of the local or regional authority (municipality, city, or county), depending on plot location.
The service that runs the procedure with the competent authority. We prepare the documentation, coordinate consultants, and conduct written communication with the spatial planning and construction department of the municipality, city, or county.
A location permit is an administrative procedure with its own pace. Authority deadlines do not bend to our preferences. Our obligation is for the documentation to be flawless and for every written exchange to be kept in the decision log.

Three views on the same scope: deliverables, your inputs, and what is out of scope.


A question about what you just read? Write to us.
Authority duration is set by the authority. Our part (preparation and submission) is usually six to ten weeks; total procedure duration is typically six to eighteen months depending on complexity.


On a final location permit we hand over the complete file and start the main project.


The outcome depends on applicable law, evidence completeness, and the authority's assessment. A final permit opens the path to the main project; it does not replace it.
Have a question? Send a short enquiry.
The file is missing an attachment, signature, or updated drawing version. The authority returns it for completion and timelines slip.
We walk the attachment and version list before sending. Missing items are added until the package is whole.
Architecture, survey, and discipline attachments do not match by date or content. The authority asks for alignment.
All attachments come from the same controlled set with the same version number. No parallel copies from different sources.
Mid-procedure the authority asks for an extra elaborate or a different form of proof. Timelines become uncertain.
We log every authority request and response with a deadline. The filing plan leaves room for supplements without improvisation.
Parcel or owner status changes while the procedure runs. The filing no longer matches the facts.
We define what happens when status changes: pause, document update, continue. Everything goes into the written procedure log.
A missing document is not a blocker for the first conversation. Note what you have, what is missing, and what you would like to reconstruct.

The location permit is the first enforceable confirmation that a project can land on a specific parcel. With it, the main project has legal ground.
A concept aligned with the spatial plan gives the procedure its input document.
Traffic, geotechnics, fire, and others depending on case and site.
Location permit (Submission)
Often run in parallel, but they are a separate formal path.
The procedure is conducted by the competent spatial-planning and construction department of the municipality, city, or county; the outcome depends on the rules, completeness, and authority assessment.

The largest losses come from incomplete submissions and misaligned versions. The location-permit service is not paperwork; it is a quality gate before any interaction with the authority.
Spatial coordination and authority-facing package discipline.
Permit-set logic and coordinated submission readiness.
Issue and version control, single source of truth for the submission set.
Completeness check before filing.
Email opens your mail app (Gmail, Outlook, Apple Mail) with a pre-filled message to info@tenet.hr. WhatsApp opens chat with the same message.
Input document list for filing, or request a fixed quote for preparation and filing.
Reply within 48 business hours. TENET does not provide loan brokerage. We use your data only for the agreed engagement.