Ownership status and cadastral data.
Legal clarity is not part of plot analysis, but unclean status blocks every next step.

Deliverables, required inputs, and boundaries - one overview in the Scope tab below.
Full scopeThe first step is not a sketch. The first step is a list of constraints. Before we propose a solution, we map the regulatory framework, the spatial conditions, and the technical limits that shape what can actually be built.
Every client starts with an assumption about what their site can accept. That assumption is usually too optimistic. Our job is to establish the range of genuinely feasible scenarios before time and money are spent on a concept that will not survive the planning regime.
The service is available for projects in Zagreb, Zadar, Dalmatia, and other locations in Croatia, depending on project type and scope.

Three views on the same scope: deliverables, your inputs, and what is out of scope.


A question about what you just read? Write to us.
Typically two to four weeks, depending on how quickly authorities release the underlying data. The deadline is given as a range, not as a promise.


The feasibility study stands on its own. If the client continues, concept design follows.


Analysis and feasibility do not replace an official decision of the competent authority or a legal opinion. They support a rational investment decision and next steps before larger spend.
Have a question? Send a short enquiry.
The spatial plan is interpreted verbally or from old experience, without a fresh extract. Later it turns out that envelope, use, or conditions do not hold.
Step one is an official extract and a check of the layers that apply to the parcel. Only then do we conclude on feasibility.
The parcel boundary is unclear or ownership is not clean. A project on that base stops as soon as the authority asks for proof.
Identified issues go to legal coordination before any drawing. We do not spend time on a concept while status is unclear.
Connections, easements, or network capacity are not checked at the start. A late discovery breaks assumptions about building.
Before a feasibility estimate we check connection conditions and on-site limits. The result goes into the written conclusion.
A sales narrative promises more than the plan and parcel allow. The client builds expectations on a figure that will not pass review.
We deliver the range the plan actually allows, even when the answer is negative. Better early than after a design contract.
A missing document is not a blocker for the first conversation. Note what you have, what is missing, and what you would like to reconstruct.

The study stands alone, but it is also the input every serious concept design needs. With it, concept rests on facts and permit procedures stay within a frame that is already mapped.
Legal clarity is not part of plot analysis, but unclean status blocks every next step.
Plot analysis
This service does not replace official interpretation by the competent authority; it makes those interpretations predictable.

A rigorous pre-investment step reduces late corrections and enables a real go/no-go before money is committed to design and permits. The standard is to base the decision on a documented set of assumptions, not on a verbal agreement.
Strategic definition and brief preparation before design commitment.
Programme validation, site and regulatory framing before sketches.
Authoritative inputs, assumptions, and decision records.
Early clarity on scope and exclusions reduces downstream claims and rework.