Main project
The main project is the core of the application and the frame for the request.

Procedure with the competent building department.
Deliverables, required inputs, and boundaries - one overview in the Scope tab below.
Full scopeFiled with the competent building department at the same administrative level (municipality, city, or county). Building inspection oversees execution; the application goes to the administrative department.
The service that runs the building-permit procedure. We submit the main project and supporting elaborates, respond to supplements, and maintain a written log of communication with the building authority.
A building permit is an administrative procedure with deadlines set by the authority, not the studio. Our obligation is complete documentation, timely supplements, and transparent status for the client. We do not promise an issuance date.

Three views on the same scope: deliverables, your inputs, and what is out of scope.


A question about what you just read? Write to us.
Our part (application preparation and correspondence) is typically four to eight weeks to first decision; total procedure duration is usually three to twelve months, depending on authority and supplements.


On a final building permit we hand over the file and start the execution project for the contractor, or confirm execution design already in preparation per addendum.


Our part is a complete filing, timely supplements, and a clear communication log. A building permit is not a guarantee of build cost or a substitute for an execution project.
Have a question? Send a short enquiry.
The application lacks an elaborate, author signature, or updated drawing. The authority returns it and the procedure stops until completion.
We walk the main project and attachments against the authority list before filing. Supplements stay inside the team, not under authority deadline pressure.
Power, water, or gas conditions do not match drawings or each other. The application returns for alignment.
We open the list of required consents and deadlines before filing. Each consent has an owner and attachment version.
Ownership, easement, or co-ownership is unclear while the procedure runs. The authority may pause until status is clarified.
Before filing we check ownership and legal status with the client's lawyer. Open points are closed or recorded as risk.
A new rule or authority note requires a different proof or elaborate. The existing filing no longer fits.
We track authority publications and requests during the procedure. The filing is updated in a controlled way with a log of each change.
A missing document is not a blocker for the first conversation. Note what you have, what is missing, and what you would like to reconstruct.

The building permit is the legal confirmation that the main project may become a construction site. With it, the execution project has firm ground and construction sits inside a lawful frame.
The main project is the core of the application and the frame for the request.
From utility operators and other bodies depending on the case.
Building permit (Submission)
The standard preparation for site begins once the permit is final.
A final permit is the prerequisite for a lawful start of works.
A related administrative filing that follows a final permit.
The building permit is issued by the competent building department of the municipality, city, or county; building inspection oversees execution, but the application goes to the administrative department.

The building-permit procedure is work with the competent building department. Preparation discipline, supplement speed, and a written communication log directly drive procedure duration.
Technical package as the basis for the regulatory procedure.
Disciplined filing, response cycles, audit trail.
Single source of truth for every submission version.
Completeness check before every authority interaction.
Email opens your mail app (Gmail, Outlook, Apple Mail) with a pre-filled message to info@tenet.hr. WhatsApp opens chat with the same message.
Documents and consents required for filing, or request a fixed quote for preparation and filing.
Reply within 48 business hours. TENET does not provide loan brokerage. We use your data only for the agreed engagement.