Građevinska dozvola, pregled usluge.

Building permit (Submission)

Building permit (Submission)

Procedure with the competent building department.

What we deliver

Deliverables, required inputs, and boundaries - one overview in the Scope tab below.

Full scope

What we need from you

  • Main project and agreed elaborates package.
  • Power of attorney for representation before the authority.
  • Payment of administrative fees when due.
  • Timely approval of changes if the authority requires documentation adjustment.
More in scope

Filed with the competent building department at the same administrative level (municipality, city, or county). Building inspection oversees execution; the application goes to the administrative department.

The service that runs the building-permit procedure. We submit the main project and supporting elaborates, respond to supplements, and maintain a written log of communication with the building authority.

A building permit is an administrative procedure with deadlines set by the authority, not the studio. Our obligation is complete documentation, timely supplements, and transparent status for the client. We do not promise an issuance date.

ScopeFAQWhy TenetContact

Građevinska dozvola, kontekst.
2.7.1

What we deliver

Three views on the same scope: deliverables, your inputs, and what is out of scope.

  • 1Building-permit application with attachment list.
  • 2Coordination of supplements and elaborates requested during the procedure.
  • 3Written communication with the competent building department (municipality, city, or county).
  • 4Correspondence log and status note on request.
  • 5Handover of the final building permit and complete file to the client.
Građevinska dozvola, pregled usluge.
Građevinska dozvola, dokumentacija.

A question about what you just read? Write to us.

2.7.3

Duration and rhythm

Our part (application preparation and correspondence) is typically four to eight weeks to first decision; total procedure duration is usually three to twelve months, depending on authority and supplements.

Građevinska dozvola, trajanje.
2.7.4

Scope

  • We do not guarantee outcome or permit issuance date.
  • We do not pay fees on behalf of the client.
  • We do not produce the main project in the building-permit procedure, that is a separate service.
  • We do not conduct litigation; that is legal counsel.
Građevinska dozvola, opseg.
2.7.5

When we finish this service for you, what is your next step toward a completed project?Execution project

On a final building permit we hand over the file and start the execution project for the contractor, or confirm execution design already in preparation per addendum.

Građevinska dozvola, nastavak.
2.7.6

Frequently asked questions

Građevinska dozvola, regulatorni okvir.

Have a question? Send a short enquiry.

2.7.9 · Risks and solutions

What slows the procedure.

  • Risk

    Incomplete main project

    The application lacks an elaborate, author signature, or updated drawing. The authority returns it and the procedure stops until completion.

    Solution

    Check before filing

    We walk the main project and attachments against the authority list before filing. Supplements stay inside the team, not under authority deadline pressure.

  • Risk

    Misaligned operator consents

    Power, water, or gas conditions do not match drawings or each other. The application returns for alignment.

    Solution

    Consent plan before filing

    We open the list of required consents and deadlines before filing. Each consent has an owner and attachment version.

  • Risk

    Legal ambiguities

    Ownership, easement, or co-ownership is unclear while the procedure runs. The authority may pause until status is clarified.

    Solution

    Pre-check with legal counsel

    Before filing we check ownership and legal status with the client's lawyer. Open points are closed or recorded as risk.

  • Risk

    Regulation change mid-procedure

    A new rule or authority note requires a different proof or elaborate. The existing filing no longer fits.

    Solution

    Tracked updates and adjustment

    We track authority publications and requests during the procedure. The filing is updated in a controlled way with a log of each change.

2.7.10 · Document checklist

What must be ready before filing for a building permit.

  • 1Complete main project with author certifications.
  • 2Special conditions and utility-operator consents.
  • 3Ownership or legal-status evidence for the parcel.
  • 4Power of attorney for representation.
  • 5Administrative fees paid as invoiced.

A missing document is not a blocker for the first conversation. Note what you have, what is missing, and what you would like to reconstruct.

Građevinska dozvola, veze.

2.7.12 · How this connects

Where the building permit sits in the process.

The building permit is the legal confirmation that the main project may become a construction site. With it, the execution project has firm ground and construction sits inside a lawful frame.

Before this service

4

Main project

The main project is the core of the application and the frame for the request.

·

Consents and special conditions

From utility operators and other bodies depending on the case.

5

Building permit (Submission)

This service

Unlocks next

6

Execution project

The standard preparation for site begins once the permit is final.

·

Start of construction

A final permit is the prerequisite for a lawful start of works.

Useful in parallel

·

Site registration

A related administrative filing that follows a final permit.

The building permit is issued by the competent building department of the municipality, city, or county; building inspection oversees execution, but the application goes to the administrative department.

Građevinska dozvola, standardi.
2.7.7

Industry standards we build on

The building-permit procedure is work with the competent building department. Preparation discipline, supplement speed, and a written communication log directly drive procedure duration.

  • RIBA Stage 4 → submission

    Technical package as the basis for the regulatory procedure.

  • AIA Permit procedure

    Disciplined filing, response cycles, audit trail.

  • ISO 19650 · CDE

    Single source of truth for every submission version.

  • Project governance

    Completeness check before every authority interaction.

Quick contact

Send a quick enquiry · Building permit

Email opens your mail app (Gmail, Outlook, Apple Mail) with a pre-filled message to info@tenet.hr. WhatsApp opens chat with the same message.

Checklist or quote

Building permit preparation

Documents and consents required for filing, or request a fixed quote for preparation and filing.

Direct contact

Write to us or call.